A work-class trencher we operate to bury cables and pipelines on the deep seabed — built for strong current and zero visibility.
We operate URI-T as a subsea construction service — for stable, repeatable burial in the harshest conditions.
High-pressure jetting buries cables and pipelines cleanly.
Holds position and heading against strong current.
Subsea inspection and intervention beyond trenching.
Sealed enclosures rated to the full 2,500 m envelope.
Active winch for stable tension and safe handling.
Sonar, video and navigation sensors for precise control.
| Operating depth | 2,500 m |
| Max. burial depth | 3.0 m+ |
| Max. burial speed | 2 km/h @ 1 m burial depth |
| Max. transit speed | 3.0 knots+ |
| Platform size | 6.5 (L) × 5.5 (W) × 4.5 (H) m |
| Platform weight | 25 t (in air) · 500 kg (in water) |
| Total power | 933 HP — hydraulic system 333 HP + 2 × 300 HP water-jet |
| Cable sensing | TSS350 / TSS440 buried-line trackers |
Sea-trial proven at 500 m — burial to 3.03 m depth, with robot-arm and water-jet operations.





From offshore-wind cables to energy highways, URI-T is built for the work.
Request a capability briefing →